Public Notices
- Public Notice: Proposed Construction, Operation and Maintenance of the Village of Dowell Wastewater Lagoon Dam in Jackson County, Illinois. Comments will be accepted through March 27, 2026.
- Public Notice: Landwehr Construction, Inc. Barge Loading Dock Replacement, Illinois River Mason County. Comments will be accepted through March 27, 2026.
- Public Notice: Proposed Major Modification of D&W Finepack Pond Dam Lake County, Illinois. Comments will be accepted through March 27, 2026.
- Public Notice: Installation of marine fiber optic cables, in Lake Michigan, near Northerly Island, Chicago, IL 60605. Comments will be accepted through April 5, 2026.
- Public Notice: Construction of New US 51 Bridge Crossing of the Ohio River near Cairo, Illinois in Alexander County. Comments will be accepted through April 1, 2026.
- Public Notice: Removal of existing fencing and installation of new fencing, in Lake Michigan, at 800 Gillson Park Drive, Wilmette, IL 60091. Comments will be accepted through April 27, 2026.
- Public Notice: Brandon Road Interbasin Project on the Des Plaines River Increment II in Will County Jointly by the US Army Corps of Engineers and the Illinois Department of Natural Resources. Comments will be accepted through April 27, 2026.
- Public Notice: Boat Dock System Reconfiguration on the Fox River in the City of McHenry by Vickie's Place. Comments will be accepted through April 20, 2026.
Lists of applications-for-permits currently under review by the Chicago, Bartlett, and Springfield Offices are available on the Permit Programs page.
If a Notice is unavailable, please contact the Webmaster. Notice downloads are automatically disabled once the comment period has ended.